Project Photos - Dunvegan Bridge Project

Project: Dunvegan Bridge -suspension span concrete deck replacement located 100 km north of Grande Prairie Alberta crossing the Peace River. This 1800 foot suspension span required the systematic removal of the concrete deck allowing for one lane of traffic to be maintained with minimal closures. Precast panels were  placed under very strict conditions to maintain the bridge integrity.

Position:  Owner / Engineer representative. I was also brought in specifically to assist the contractor in moving this project foreword to meet schedule. My involvement with the contractor was well received and resulted in a higher level of partnering.  The bridge was opened to two lane traffic on schedule, Oct 31st 2009.

Category List
Dunvegan-001
Dunvegan-001
Image Detail Image Download
Dunvegan-003
Dunvegan-003
Image Detail Image Download
Dunvegan-005
Dunvegan-005
Image Detail Image Download
Dunvegan-007
Dunvegan-007
Image Detail Image Download
Dunvegan-009
Dunvegan-009
Image Detail Image Download
Dunvegan-017
Dunvegan-017
Image Detail Image Download
Dunvegan-021
Dunvegan-021
Image Detail Image Download
Dunvegan-026
Dunvegan-026
Image Detail Image Download
Dunvegan-038
Dunvegan-038
Image Detail Image Download
Dunvegan-1
Dunvegan-1
Image Detail Image Download

 

Display Num