Nass River

Nov 2014 to Feb 2015

Nass River, 100kms Northeast of Terrace, BC

The project was a design build project between Surespan and Associated Engineering and was a very technically challenging replacement. 

  • the removal of the existing 138 meter glulam bean structure
  • replacement with a steel concrete composite bridge

Position: On site representative for Associated Engineering (BC) Ltd. as part of the design build team.