Saline Creek Bridge Project

2012 / 2013

Saline Creek, Fort McMurray, Alberta

A complex project featuring the construction of a roadway bridge, pedestrian bridge, retaining walls and 3 km of roadway connecting Fort McMurray’s lower town site to the community of Waterways.

  • 42 meter 4 lane road bridge, super elevated cast in place post tensioned voided deck structure bridge
  • 62 meter horizontally curved, post tensioned, cast in place concrete box girder supported by a tilted 1.2 meter steel arch

Position: On site representative for Associated Engineering focused mainly on the bridges. Other duties included relief site representative on the road construction portion of the project.