Saskatchewan 6 Bridges on Hwy 1

2010

Position: Associated Engineering Ltd. and the Ministry of Highways and Infrastructure Site Representative.

This project was the replacement of six bridges on Highway #1 westbound and eastbound lanes over three Saskatchewan Minerals Inc. channels near Chaplin Saskatchewan.

This was a fast tracked project which was completed during a period of record breaking rainfall over 7 months.

The project was completed within this extremely tight time frame.